Total Cost
Included as a measure. The formula text stays in the download.
Catalogue preview of finished digital products. Checkout does not take payment yet, and files are not released until a verified payment exists.
ANL-011
R 359,00
Also $29.00 · £22.00 · €25.00
Costs by cost code for a small building job.
Adding an item saves it in your cart. Payment providers are not connected, so this does not charge a card or send the files.
These are the sheets in the workbook.
| Month | Name | Cost |
|---|---|---|
| 2026-01 | Labour | 48000 |
| 2026-01 | Materials | 36007 |
| 2026-01 | Hire | 9014 |
| 2026-02 | Labour | 36015 |
| 2026-02 | Materials | 9022 |
| 2026-02 | Hire | 48029 |
| 2026-03 | Labour | 9030 |
11 more rows are in the file.
| Metric | Value | Note |
|---|---|---|
| Total Cost | 558801 | Same total as the CSV |
| Rows | 18 | Month and name combinations |
Included as a measure. The formula text stays in the download.
Included as a measure. The formula text stays in the download.
Included as a measure. The formula text stays in the download.
The Excel file stays in the download. The tables above are a look at the sample.
Costs by cost code for a small building job.
A contractor comparing codes.
Excel summary, CSV dataset, and DAX measures
The workbook and CSV are sample data for learning the model. A PBIX file is not included. Paste the DAX into Power BI Desktop after you load the CSV. This is not a financial audit.