MohaoShop
Cart

Catalogue preview of finished digital products. Checkout does not take payment yet, and files are not released until a verified payment exists.

Analytics dashboards
Site cost ledger cover

ANL-011

Site cost ledger

R 359,00

Also $29.00 · £22.00 · €25.00

Costs by cost code for a small building job.

Type
Excel summary, CSV dataset, and DAX measures
Licence
One commercial project
Version
1.0.0

Adding an item saves it in your cart. Payment providers are not connected, so this does not charge a card or send the files.

Look inside

These are the sheets in the workbook.

Data

MonthNameCost
2026-01Labour48000
2026-01Materials36007
2026-01Hire9014
2026-02Labour36015
2026-02Materials9022
2026-02Hire48029
2026-03Labour9030

11 more rows are in the file.

Summary

MetricValueNote
Total Cost558801Same total as the CSV
Rows18Month and name combinations

Total Cost

Included as a measure. The formula text stays in the download.

Cost rows

Included as a measure. The formula text stays in the download.

Average Cost

Included as a measure. The formula text stays in the download.

The Excel file stays in the download. The tables above are a look at the sample.

What it is

Costs by cost code for a small building job.

A contractor comparing codes.

Opens in

Excel summary, CSV dataset, and DAX measures

The workbook and CSV are sample data for learning the model. A PBIX file is not included. Paste the DAX into Power BI Desktop after you load the CSV. This is not a financial audit.